SUPAbead Insulation
An answer to a difficult problem
The varied nature of housing stock across the country
has show a significant proportion of housing containing partial fill insulation
This technical problem can now be over come by using
Miller Pattison's SUPAbead and SUPAbead Plus as a cavity fill solution.
Specifically designed to meet the needs of the house
builder, SUPAbead and SUPAbead Plus can assist in achieving code level 3 as it offers
a 15 to 20% improvement in thermal performance over most current injected systems.
Application is undertaken by drilling small holes into
the external brick work of the property and injecting SUPAbead / SUPAbead Plus into
the cavity. Our fully trained assessors will visit the site to carry out a full
technical assessment and advise on the most suitable timescale for installation
to be carried out.
Due to the unique way in which the system has been designed,
it is guaranteed not to transmit moisture while the cavity remains breathable at
all times. A cavity fill of high integrity with consistent density is achieved in
every building, regardless of shape or size* (*suitable residual cavity 50mm or
greater).
SUPAbead and SUPAbead Plus ticks all the right boxes.
- Fast installation
- BBA approved
- Provides a unique solution
- Cost effective
- Clean installation
- Fewer drilling holes
- Instant effect
Download our SUPAbead leaflet