Cavity Wall Insulation
We are installers of a range of cavity wall insulation systems. All products
are installed to the British Board of Agreement standards and are
the leading cavity wall insulation system on the market. Each installation
team is entirely self-sufficient and requires no further services
or involvement of the client.
Most cavity wall installations are
completed within hours, and all with no inconvenience with other
occupants or traders. All of the products are water repellent,
non-toxic, carry a guarantee and are suitable to
use in all areas of the United Kingdom. With Experience
and fully trained, carefully supervised cavity wall
insulation installers, we are able to to provide
a highly effective and trouble- free service. |
|
 |
We are fully approved by the manufacturers to install
both Rockwool Energysaver and Knauf Superfil Cavity Wall
Insulation. The product can be injected into the cavity
via the inner leaf and offers very impressive thermal performance.
The material is injected through small 26mm or 22mm holes
prior to boarding and plastering. Should external drilling
be required, (i.e. refurbishment of an existing property),
then the holes are drilled between the corners of the bricks
to a precise approved drilling pattern with the mortar
replaced and colour matched on completion.
Cavity Wall Insulation Procedures
Mineral cavity wall insulation injected into the cavity eliminates the requirements
for expensive lightweight or insulated blockwork and can offer considerable
cost savings over other techniques. In newly constructed buildings the cavity
wall insulation is often installed through the inner leaf prior to plastering
or dry lining. Materials and workmanship are fully guaranteed.
Cavity Wall Insulation New
Houses
The service that we offer is true supply and fix installation using materials
exstock from our own local depots. Fitting is carried out from our own teams
and the client can be confident that both materials and labour elements of
the service are guaranteed. This can be in stark contrast to the technique
whereby labour only bricklayers build in insulation slabs as building progresses.
In these circumstances the house builder may be faced with unforeseen costs
when he discovers that, although a manufacturer may stand by its product, the
labour element remains the builders responsibility, Building regulations require
specific U values to be achieved.
Back
|

|
 |
|
10 May 2008 |